• Socsa@sh.itjust.works
    link
    fedilink
    English
    arrow-up
    4
    ·
    1 day ago

    What a fun project to work on. A truly unique engineering challenge with no history to draw from.

  • lefty7283@lemmy.worldOP
    link
    fedilink
    English
    arrow-up
    9
    ·
    3 days ago

    Looks like a $843 million contract to deorbit it sometime in 2030, and the deorbit vehicle is going to burn up as well. They could maybe just send up a starship without any tiles/flaps at that point? Hopefully some of these commercial LEO stations really get going before then to replace it…

    • cmnybo@discuss.tchncs.de
      link
      fedilink
      English
      arrow-up
      8
      ·
      3 days ago

      It would need suitable engines for the deorbit burn. I’m not sure that the RCS thrusters would be powerful enough. The raptors are too powerful, even one at minimum throttle would probably rip the ISS apart.

    • 0110010001100010@lemmy.world
      link
      fedilink
      English
      arrow-up
      8
      ·
      3 days ago

      According to a different article I was just reading, sounds like the 2030 isn’t a hard date and it may be extended if commercial stations aren’t ready to go:

      While the 2030 end date has been referenced in NASA budgetary materials in recent years, some NASA officials have stated that the station could potentially remain operational past that date. “There’s nothing magical that happens in 2030,” Steve Stich, manager of NASA"s commercial crew program at Johnson Space Center (JSC) in Houston, said during a Jan. 25, 2024 briefing.

      Stich added that the ISS will continue operations until commercial space stations are in orbit and ready for crews. “We want [the commercial stations] to be supportive, and then when they’re ready to go, that’s when ISS will move out of the way,” Stich said.

      Source: https://www.space.com/nasa-spacex-international-space-station-deorbit-vehicle

      • burble@lemmy.dbzer0.com
        link
        fedilink
        English
        arrow-up
        5
        ·
        3 days ago

        Part of why the commercial stations won’t be ready is because the ISS won’t commit to a deorbit date, so they can’t predict the market!

        2030 should be the absolute latest, or the leaks on the Russian side will take the whole thing down.

    • becausechemistry@lemm.ee
      link
      fedilink
      English
      arrow-up
      2
      ·
      2 days ago

      It’s way closer to burning up (like, it’ll do it soon and uncontrollably without intervention) than a typical graveyard orbit. And if (when) it started breaking up in a poorly-chosen museum orbit, things would get very messy very fast.

      I say send up a lil robot buddy that can hover around and 3D scan the interior for a few months and let anyone with a VR headset go hang out when they want to answer emails or whatever.

      • thefartographer@lemm.ee
        link
        fedilink
        English
        arrow-up
        1
        ·
        15 hours ago

        I love the 3D scanning idea. That would be a dream come true to have a virtual tour of the ISS

        One of those places I’ve always wanted to see and hoped to never visit

  • Decronym@lemmy.decronym.xyzB
    link
    fedilink
    English
    arrow-up
    5
    ·
    edit-2
    15 hours ago

    Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I’ve seen in this thread:

    Fewer Letters More Letters
    JSC Johnson Space Center, Houston
    LEO Low Earth Orbit (180-2000km)
    ~ Law Enforcement Officer (most often mentioned during transport operations)
    RCS Reaction Control System

    3 acronyms in this thread; the most compressed thread commented on today has 20 acronyms.

    [Thread #47 for this sub, first seen 26th Jun 2024, 23:10] [FAQ] [Full list] [Contact] [Source code]