• Matt G@lemmy.sdf.org
    link
    fedilink
    arrow-up
    3
    ·
    4 days ago

    From what I understand a lot of the UK rail network is reliant on old infrastructure, think Victorian era bridges/tunnels. These weren’t designed with rail electrification in mind so may not have room for a train and an overhead line for example. While there may be solutions for each individual instance of this sort of problem, solving them involves addressing each of them individually and takes more time and money than electrification would in a vacuum.