• cron@feddit.org
    link
    fedilink
    arrow-up
    3
    ·
    2 days ago

    Charging rates will range from 100 kW to 1 MW, depending on the specific operational requirements within the fleet.

    Nice that charging at megawatt speeds is finaly technically feasible, at least for trucks. You probably don’t want to charge a 600 kWh truck at a 300 kw station.