Battery electric hybrid, to be exact, with no diesel involved. Scheduled to arrive 2028-2029

  • Ilovethebomb@lemmy.nzOP
    link
    fedilink
    arrow-up
    2
    ·
    1 year ago

    There’s a big difference between renewing the existing lines, and completely changing the system. You’re increasing the operating voltage more than 10x, the insulators and clearance required would be huge. You’d have to raise bridges, lower the floors of tunnels, completely renew the poles, lines, and insulators, all while keeping the lines running during the day.

    Not only that, but this would require massive alterations to the rolling stock once the change happens, which would have to be done all at once after you switch voltages.

    I understand the sentiment, but it would be an absolute boondoggle.

    • Dave@lemmy.nzM
      link
      fedilink
      arrow-up
      2
      ·
      1 year ago

      Oh yes, of course it would be a massive job. But I’m just saying, maybe someone should have a plan. As far as I can tell, no one has a unified plan for what we want our rail network to look like in 50 years.