• Salvo@aussie.zone
    link
    fedilink
    English
    arrow-up
    2
    ·
    1 year ago

    Powered sites are still the exception at camping grounds. Even then, caravan parks that do have powered sites only have 15A GPO outlets because that’s what caravans have. They currently aren’t able to even supply 7A per outlet continuously for hours during the night.

    Most regional Hotels do not usually have infrastructure tor recharging guests cars and even ‘Motor Hotels” (Motel) are only now realising that their visitors car need to recharge at the end of the day, just like their 2-legged guests.

    Hopefully private enterprise does expand infrastructure to accommodate EVs but a better option would be for Public Transport to expand infrastructure so that private vehicles are no longer required.